Jump to content


Photo

Dragoon And Its Friends


  • Please log in to reply
341 replies to this topic

#341 JasonJ

JasonJ

    nonbiri

  • Members
  • PipPip
  • 11,016 posts

Posted 13 September 2019 - 0930 AM

Thailand bought some Strykers

thailandstryker.jpg

https://www.bangkokp...rs-to-thai-army


  • 0

#342 JohnAbrams21

JohnAbrams21

    Crew

  • Members
  • PipPip
  • 288 posts

Posted 14 September 2019 - 2031 PM

Dragoon moves forward in a big way:
 

 
Army to outfit Double V-Hull Strykers with 30mm firepower
 
 

WASHINGTON — The Army has decided to outfit three out of six of its brigades equipped with Double V-Hull A1 Stryker Infantry Carrier Vehicles with 30mm guns, according to an Army official.
 


The service plans to open up a competition to integrate and field up-gunned DVHA1, the official told Defense News on background.
 


The Army Chief of Staff Gen. Mark Milley and the Army Requirements Oversight Council decided on March 20 to equip future Stryker brigades with 30mm Medium Caliber Weapon System (MCWS) capability after reviewing lessons learned from the 2nd Cavalry Regiment in Europe. But he also directed the Army to ensure that the new MCWS capability be applied to the more mobile, better protected DVH ICVVA1 that will be the basis for the future Stryker fleet, according to the official.
 

Based on an urgent operational need out of Europe, the Army was provided emergency funding from Congress in 2015 — a little over $300 million — to rapidly develop and field a Stryker with a 30mm cannon specifically for the 2nd Cavalry Regiment, which is permanently stationed in Germany. The funding covered development, eight prototypes and upgrades to 83 production vehicles, as well as spares.
 

The Army spent 18 months to put together its upgunned Stryker using off-the-shelf solutions, such as the remote turret, from Kongsberg in Norway, and the 30mm cannon from Orbital ATK, and shipped those vehicles off to Europe for an evaluation that went on for the better part of a year.
 


The plan going forward is to execute a competition in two phases to select a 30x173mm-equipped MCWS integrated onto a Stryker DVH ICVVA1, the official said, which will lead to equipping the first brigade with a new capability in fiscal year 2022.

Is there a law that says they can’t just buy more of the Dragoon Strykers instead of holding a competition that takes 2-3 years? Possibly by using UOR funding like was done earlier to speed up the process?
  • 0